Generally, what do I need to bring to get a building permit?

Once a permit application has been filled out, then an applicant needs to have a stamped septic design, a detailed design of the dwelling including a cut-away drawing, a plot plan of the property, a sketch of where the house will sit on the property, a current copy of the deed, and an erosion control plan. If the proposed home will have a chimney, then a disclosure form also must be filled out.